Change the status of a project:
Click Costing, then click Projects.
Find the project and open the record.
Click Edit.
In the Status dropdown, select the required status and click Save.
Change the status of a project:
Click Costing, then click Projects.
Find the project and open the record.
Click Edit.
In the Status dropdown, select the required status and click Save.