Unfortunately it isn't possible to add a default Project Code to Purchase or Sales Analysis Codes. However, a Default Cost Centre for an Analysis Code can be added by going to the following:
Creditors (or) Debtors, Settings, Analysis
Choose the Analysis code and select Edit
Choose the Cost Centre and click Save
