How to add a default Cost Centre and Project Code to an Analysis Code

Updated over 2 months ago

Unfortunately it isn't possible to add a default Project Code to Purchase or Sales Analysis Codes. However, a Default Cost Centre for an Analysis Code can be added by going to the following:

  1. Creditors (or) Debtors, Settings, Analysis

  2. Choose the Analysis code and select Edit

  3. Choose the Cost Centre and click Save