Skip to main content

Add a default cost centre to an analysis code

It is not possible to add a default Project Code to purchase or sales analysis codes. A default cost centre can be added as follows:

  1. Click Creditors or Debtors, then click Settings, then click Analysis.

  2. Click the analysis code, then click Edit.

  3. Select the Cost Centre and click Save.

Did this answer your question?